Project Details Of Daduru Oya Reservoir


The proposed dam site is located about 300 meters upstream of the existing Ridi Bendi Ella anicut and the proposed reservoir will interrupt a net catchment area of 1400 sq.kms. The Project envisages construction of a 75 MCM reservoir across the Deduru Oya.



Total Estimated Cost                                             
- 6200 Mn                                                    
Catchments Area
- 1400 Sq. Km
Storage capacity
- 75 MCM
Dam             
- Earth fill


Full Supply Level    
- 70 m. MSL
Spillway Type                                                       
- Concrete, Radial gated (08 N0s).
Length of the Left Bank canal                                 
- 44 km
Length of the Right Bank canal                                
- 33 km


Land inundated                                                      
- 2000 h.a  
Total extend of Lands to be cultivated                    
- 11115 h.a